Manufacturing Capacity

Plant Capacity. Under Control.

Real-time occupancy tracking for your manufacturing facility. Safety compliance, zone management, and production optimization.

100%
Safety Compliant
Real-Time
Floor Count
35%
More Efficient
Plant Capacity
Live
80% Capacity
248
On Floor
310
Limit
62
Available
Production Floor
145/180
Assembly Line A
52/60
Visitors
12/25
Safety Compliant
Floor Count
Day Shift
248
of 310 maximum capacity
Current 80% capacity
Workers
On shift
224
Contractors
External
12
Visitors
Escorted
12
Badge Scanner
Active
Floor Capacity

Know Your Floor Count. Always.

Real-time head count across your entire facility. Track workers by zone, visitors on site, and total plant capacity at a glance.

Worker Head Count

Real-time personnel across all zones

Zone Tracking

Workers per production area

Visitor Count

Contractors and guests on site

Capacity Meter

Visual occupancy dashboard

Safety Compliance

Meet OSHA and fire marshal requirements with automated occupancy tracking.

Zone Capacity 6 zones
Production Floor
145/180
Assembly Line A Near Full
52/60
Assembly Line B
38/60
Quality Control Almost Full
18/20
Shipping/Receiving
15/35
3 deliveries scheduled
<80%
80-90%
90%+
Full
Zone Management

Every Zone. Every Limit.

Track capacity separately for production floor, assembly lines, quality control, break rooms, and shipping zones. Each area has its own safety limit.

Production Floor

Main manufacturing area

Assembly Lines

Line-specific capacity

Quality Control

QC area limits

Shipping/Receiving

Dock zone tracking

Flow Control
Shift Change
Shift handoff in progress

Day shift to evening shift • Est. 25 min

Shift Status Transitioning
186
Day Leaving
142
Evening Arriving
Scheduled Access
5
HVAC Maintenance (2) 3:30 PM
Safety Inspection (3) 4:00 PM
Safety Protocols
Fire Routes Clear
PPE Compliant
Recent Activity
Evening crew badged in (12)
2m ago
Day crew badged out (18)
5m ago
Flow Control

Shifts Change. Stay in Control.

Manage shift handoffs, visitor scheduling, and contractor access. Safety protocols activate automatically when zones reach capacity.

Shift Handoffs

Manage shift transitions

Visitor Scheduling

Pre-approved site access

Contractor Mgmt

Track external workers

Safety Protocols

Emergency procedures

Maximize Throughput

Optimize worker placement and flow to hit production targets safely.

Capacity Analytics
Occupancy by Shift
Day
Eve
Night
10:30am
Peak Capacity
94%
Max Utilization
Zone Utilization (Avg)
Production
82%
Assembly A
88%
QC
91%
0
Safety Incidents
+12%
Efficiency
Insight

QC zone consistently at 90%+ during day shift. Consider adding capacity or staggering inspections.

Analytics

Understand Your Patterns

Know exactly when zones hit capacity, track shift transitions, correlate safety incidents, and optimize production efficiency with occupancy data.

Shift Patterns

Peak occupancy by shift

Zone Utilization

Area efficiency metrics

Safety Incidents

Incident correlation

Production Efficiency

Output vs capacity

Ready to Manage Your Plant Capacity?

Join manufacturers using NOWAITN for real-time occupancy tracking.

Safety compliance • Zone management • Shift coordination