Manufacturing Pace

Precision Pace, Peak Production

Production line pace management that maximizes output and minimizes waste.

22%
Faster Cycles
4.2s
Avg Takt
97.8%
OEE Score
🏭 Line Status

Assembly Line A

Shift 2 • 2:30 PM

ON PACE
4.2s
Takt Time
847
Units/Hour
97.8%
OEE
S1

Assembly

Primary mount

4.1s

On takt

S2

Fastening

Screw insertion

4.8s

+0.6s slow

S3

Inspection

Quality check

3.9s

On takt

Shift Progress 3,412 / 4,000
⏱️ Cycle Timer

Station 2 - Fastening

Line A • Position 2

SLOW
4.8s

Current Cycle Time

Target: 4.2s +0.6s over
LAST 10 CYCLES
4.1
4.2
4.0
4.6
4.8
4.9
4.7
4.8
4.8
4.8

Showing degradation pattern

Pace Degradation Detected

Possible cause: Tool wear or part fit issue. Check screw feeder.

Line Pace

Master Your Line Speed

Real-time cycle time tracking and takt time management for every station on your production line.

Cycle Time Tracking

Monitor every station in real-time

Takt Time Display

Live pace vs target visualization

Line Balancing

Identify bottlenecks instantly

Pace Alerts

Notifications when lines fall behind

Increase Output by 22%

Optimal line pace means more units without adding shifts.

⚖️ Line Balance
Line Balancing
Assembly Line A • 8 Stations
Takt: 4.2s
S1 4.0s
S2 4.8s
S3 3.9s
S4 4.1s
S5 4.2s
S6 3.6s
S7 4.0s
S8 4.0s

← Takt line (4.2s)

S2

Bottleneck

S6

Spare Cap.

91%

Balance %

Station Timing

Optimize Every Station

Detailed timing for each workstation helps you balance lines and reduce changeover time.

Station Metrics

Time per operation per workstation

Changeover Timing

Track and reduce setup times

Idle Time Analysis

Find and eliminate wait times

Trend Analysis

Spot degradation before it impacts output

🔄 Shift Handoff
Shift Handoff
2:50 PM

Shift 1

Ending

6AM - 3PM

Shift 2

Starting

3PM - 12AM

SHIFT 1 SUMMARY

4,112

Units

98.1%

OEE

4.1s

Avg Takt

HANDOFF NOTES
Station 2 running slow - check screw feeder
Station 6 tooling replaced at 1PM
New batch of parts in staging
Shift Manager

Seamless Shift Operations

Manage shift handoffs, break timing, and crew performance to maintain consistent output.

Shift Handoffs

Seamless transition between shifts

Break Scheduling

Optimize break timing for flow

Crew Performance

Compare shift-to-shift output

Production Planning

Schedule based on actual capacity

Smooth Shift Transitions

Zero lost time at shift change means consistent output.

📊 OEE Dashboard

Production Analytics

Assembly Line A • This Week

97.8%

OEE

OEE Components
Availability 99.2%
Performance 98.8%
Quality 99.8%

32,847

Units This Week

+8%

vs Last Week

Top Pace Loss Causes
Minor stoppages 42%
Setup/changeover 28%
Equipment failure 18%
Other 12%
Production Analytics

Data-Driven Production

OEE dashboards, Pareto analysis, and automated reports for continuous improvement.

OEE Dashboards

Availability, performance, quality metrics

Pareto Analysis

Top causes of pace loss

Production Reports

Automated shift and daily summaries

Target Tracking

Real-time vs planned output

Ready to Boost Production?

Join manufacturers using pace management to increase output and reduce waste.

No credit card required. Start your free trial today.